Production saloon - W 123 - Sindelfingen plant, production
In-depth functional and operational checks ensure that the car runs off the production line in "best form". On the roller dynamometer, it is subjected to a first driving test, including the control of the idling setting (picture). This is followed by the paint inspection before the new car passes through the final acceptance and is prepared for handover or shipping, 1977
- Archive number: 77145-32
- Caption: Sindelfingen plant, production
In-depth functional and operational checks ensure that the car runs off the production line in "best form". On the roller dynamometer, it is subjected to a first driving test, including the control of the idling setting (picture). This is followed by the paint inspection before the new car passes through the final acceptance and is prepared for handover or shipping, 1977 - Info: Additional picture number: MSA009432
Press kit 2009 - Topics:
- Model Series